The corner stone of a successful dredging project is the preparation and planning that precedes the actual operations. Many variables must be identified prior to arriving on-site to assure a smooth, timely and efficient operation that attains its stated objective. Bull Dredging has developed a short questionnaire to assist us in determining what your dredging project may encompass and whether or not we can provide the methodology necessary to accomplish your dredging goals. This questionnaire is not meant to supersede an on-site investigation of your project or direct communication with you, but rather is one additional tool placed at our disposal in assisting you. If you already posses specific plans and specifications for your project many of these questions will already be answered.
Company Classification:
|
|
| |
Will this project be:
Negotiated OR
RFQ (request for quotations)
|
| |
Have funds already been allocated for this project?
Yes OR
No
|
| |
Do you have a hydrographic survey for this project?
|
|
| |
Do you have any drawings or pictures of the project that you can email?
Yes OR
No
|
| |
| Do you have a specific time frame required for the completion of this project?
Yes OR
No |
| |
What are the approximate dimensions of the dredging area?
|
|
| |
| What amount of material needs to be removed?
|
| |
| How deep is the material that needs to be dredged?
|
| |
| How deep is the water on top of the material?
|
| |
Please describe the material to be dredged:
|
| |
The material to be dredged is:
|
|
| |
| Materials to be dredged (check all that apply): |
|
|
| |
What is the percentage of solids in the material in siti?
|
|
| |
| What is the specific gravity of the material?
|
| |
| Is the material caustic, acidic, corrosive, or hazardous in any way? |
|
| |
| Is the material abrasive? |
|
| |
| Are there any obstructions in the area to be dredged? |
|
| |
| Is there any debris in the area to be dredged such as rocks, branches, metal scraps, etc.? |
|
| |
| Is there any aquatic growth in the area to be dredged? Check all characteristics that apply. |
|
| |
Disposal of Material:
|
|
| |
| What is the maximum distance from the dredge to the dewatering site?
|
| |
| What is the maximum distance of floating line required?
|
| |
| What is the vertical lift from dredge to discharge site (static head)?
|
| |
Describe any special safety precautions or special training required at your site, i.e. OSHA, MSHA, hazardous waste, chemical resistant equipment, etc.:
|
| |